   Showing 21 of 21 Projects [Show Less]  
 
Relocate Runway 04 PAPI to Runway 1
Ronald Reagan Washington National Airport
Washington, DC

Relocation of the existing NAVAID made obsolete by the runway threshold relocation to runway one. This project involved extensive coordination with the FAA, Airports Operations and the Authority’s engineering staff.

 
Authority Office Building
Ronald Reagan Washington National Airport
Washington, DC

Fast-track and budget constrained project involved the conversion of the Delta 3-gate terminal to the new Authority administration office building. Alpha’s role included civil engineering, scheduling, full-discipline cost estimating, utility mapping and field survey. In addition, Alpha performed a structural analysis of the floor structure to ensure that it could support the weight of a new filing / storage system.

 
Capital Maintenance & Investment Program (CMIP), Operations & Maintenance Program (O&M),
Ronald Reagan Washington National and Dulles International Airports
Washington, DC

Full A/E design and engineering services for Capital Improvement Projects on behalf of the Metropolitan Washington Airports Authority.

 
North Hangar Complex, Condition Assessment
Leesburg Executive Airport
Leesburg, VA

Civil and structural engineering analysis of the North Hangar Complex at Leesburg Executive Airport. Included review of the construction documents; review of all related shop drawings; surveying of each building; inspection of the roof and wall panels; in

 
Baltimore Washington International Airport
Maryland Aviation Administration
Baltimore, MD

CPM scheduling, cost estimating and construction management services. Assignments have included Elm Road Parking Garage; and Relocation of Terminal Loop Roadway and Surface Lot, under a multi-year task order contract, as part of the ongoing $4 billion Capital Improvement Program.

 
Tampa International Airport
Hillsborough County Aviation Authority
Tampa, FL

CPM scheduling, claims analysis, time impact studies and project management support services for construction of a new 16-gate, approximately 300,000-square-foot Airside "C" Terminal and a new Cooling Tower.

 
Miami International Airport
Miami-Dade Aviation Department
Miami, FL

CPM scheduling and claims management services in support of multi-billion dollar airport expansion program.

 
North Gate Complex Modifications
Ronald Reagan Washington National Airport
Washington, DC

Multi-task contract to develop modifications plan for 200,000-square-feet of building facilities on 10 acres of DCA. Included design of demolition of various terminals, demolition of UAL Gate 26, demolition and reconstruction of UAL Gate 27 and to UAL Gate 24. Alpha also designed various utility relocations and developed construction sequencing and MOT plans to allow continuous use of facilities and uninterrupted service at the Airport during this critical project.

 
El Dorado International Airport Expansion
OPAIN, S.A.
Bogota, Colombia

Project Management services for the $700-million expansion and modernization of the airport, including Planning, Design Management, Project Controls and Construction Management services.

 
Concourse B – West Expansion
Dulles International Airport
Chantilly, VA

Build out Concourse B to its maximum length at the west end and will update the original plans for expansion to the east. The work includes fit-out of new Automated People Mover stations, which are located below Concourse B, as well as remote station at the International Arrivals Building adjacent to the Main Terminal. Alpha is responsible for demolition design, surveying, utility mapping, scheduling and constructibility reviews.

 
Fuel Farm Expansion
Dulles International Airport
Chantilly, VA

Structural engineering services on this project. The project involved remedial maintenance work on 20 separate bridge structures along the Dulles Access Highway and within Dulles Airport. In addition, Alpha performed detailed condition surveys and developed containment dike wells, new facility foundations, pipe supports and miscellaneous facilities.

 
ACA Maintenance Facility
Dulles International Airport
Chantilly, VA

Civil and structural engineering design for a new 85,000-square-foot maintenance hangar at IAD. Alpha’s civil design, included storm water pollution prevention plan, aircraft pavement design, utility design and site grading; structural design included foundation and design criteria for a pre-engineered building and construction phase services.

 
Upgrade of the Heating and Cooling System
Dulles International Airport
Chantilly, VA

Civil and structural engineering design for the upgrade to the existing Utility Plant at IAD. The scope of the project included upgrade and expansion of both the HTHW system and the chilled water system. The project scope also included the upgrade of the main 13.2-kV electrical power distribution from the Virginia Power substation located on Route 28 to the Utility Plant Complex located adjacent to the Main Terminal.

 
Bravo Ramp Expansion
Dulles International Airport
Chantilly, VA

Civil engineering, scheduling, and cost estimating services on this fast-track design project. The project provides parking and fueling facilities for commercial aircraft. Alpha’s work included field investigation and records research of existing utility systems, survey support (including work within restricted AOA areas), and SPPP design.

 
Concourse C/D Study and Design
Dulles International Airport
Chantilly, VA

Multi-discipline evaluation of a 600,000-square-foot passenger terminal to determine the architectural, structural, MEP, fire protection and personnel transportation requirements to maintain the facility for the next 10 years. The structural system was evaluated for each of the facility’s various additions for compliance with applicable building codes. Following the study, Alpha performed design of repairs and improvements to the existing structure which involved designing slabs to infill openings left from the removal of the moving walkways, repairing damaged building structure elements, and designing supports for a new gas line.

 
Comprehensive Utility Survey Update
Dulles International Airport
Chantilly, VA

Civil engineering, GPS survey work, development of GIS database, communications systems, NAVAIDS, sanitary sewer, potable water, and DFS systems for Dulles Airport.

 
Rehabilitation of Access Highway Bridges
Dulles International Airport
Chantilly, VA

Structural engineering services on this project. The project involved remedial maintenance work on 20 separate bridge structures along the Dulles Access Highway and within Dulles Airport. In addition, Alpha performed detailed condition surveys and developed construction documents including maintenance of traffic plans and specifications for repair / maintenance. During construction Alpha provided construction inspection, submittal review and consultation.

 
Hangars 11 and 12
Ronald Reagan Washington National Airport,
Washington, DC

Multi-phased project involves the restoration of Hangars 11 and 12 to the original Aircraft Hangar design. Extensive exterior / interior modifications of the Hangars and building additions were made to this complex to house the US Air and Delta Terminals during construction of the new Main Terminal. Alpha provided field and utility survey and design for utility modifications, building and electrical demolition, roadway and parking lot, site restoration, grading, drainage and SPPP. Alpha also provided structural survey of Hangar 12 and structural design for construction of a new heating plant inside Hangar 11.

 
Phase VI Roads
Ronald Reagan Washington National Airport
Washington, DC

Civil engineering design in support of this roadway improvement project. Included the design of pedestrian bridges to carry users of the GW Parkway tracks over airport entrance roads, relocation of the south airport entrance to the north to normalize airport traffic circulation, design of a new entrance into an existing parking garage, and design of a new covered bus loading facility.

 
Terminal A Rehabilitation
Ronald Reagan Washington National Airport
Washington, DC

Rehabilitation of the historic Terminal A at Ronald Reagan Washington National Airport involves a multi-phase 5-year renovation program involving building restoration, terminal expansion, existing terminal demolition, apron replacement, landside reconfiguration and improvements, and the full spectrum of terminal support facilities. Alpha’s services include facility condition surveys, utilities engineering and facilities demolition design. Alpha also provided structural analysis of the floor system and structural analysis for necessary roof repairs.

 
South Area Development
Ronald Regan Washington National Airport
Washington, DC

Design of various facility consolidation projects and site development. Specifically, Alpha’s scope of work included: Demolition of the UAL Air Cargo Building, Air Cargo Building No. 1, Industrial Waste Treatment Plant (IWTP) lagoon areas, and the sand/equipment storage buildings. These areas were restored as parking areas conforming to the ultimate build-out of the South Area under the Capital Development Program, including design of the SWM facilities.