Staunton, Virginia

Project Summary
This $18.2 million project entailed the demolition and replacement of two existing bridges on Interstate 81. The bridges are four and five-span structures about 500-feet long and are approximately 60-foot high. Work included paving, structures, drainage, earthwork, maintenance of traffic and utilities.
SERVICES PROVIDED
Construction Management, Inspection, CPM Scheduling
Industry Award
Virginia Department of Transportation (VDOT), Best Project in Lexington Residency Award (2006)